DR# 28535

Author: Clayton, Ryan
Equipment: Glueline 2
Area: Robot Cage

Issue Date/Time:
2025-09-10 07:40:00
Status: OPEN
 

Problem Text:
Metal glue supply line for Robot #2 is chafed. Metal shaving all over nest area #2 to be cleaned by operator before starting.

Followup Comments:

Assignee: Crist, David
Corrective Action Date:
2025-09-10 18:53:00

Corrective Action:
replaced braided hose and gave slack to poly glue line for better articulation of braided hose that was getting chaffed

Back to DR summary list